甲公司為增值稅一般納稅人,適用的增值稅稅率為17%,其2013年至2017年發(fā)生的有關(guān)交易或事項(xiàng)如下
類型:學(xué)習(xí)教育
題目總量:200萬(wàn)+
軟件評(píng)價(jià):
下載版本
參考答案:
(1)甲公司取得土地使用權(quán)應(yīng)以其公允價(jià)值入賬,即入賬價(jià)值=1200(萬(wàn)元)。甲公司應(yīng)確認(rèn)的債務(wù)重組損失=2000-1200-500=300(萬(wàn)元)
(2)2014年1月1日甲公司發(fā)行債券的會(huì)計(jì)分錄
借:銀行存款 3893
應(yīng)付債券-利息調(diào)整 107
貸:應(yīng)付債券-面值 4000
(3)2014年:實(shí)際利息費(fèi)用=3893×6%=233.58(萬(wàn)元)
應(yīng)付利息=4000×5%=200(萬(wàn)元)
利息調(diào)整的攤銷額=233.58-200=33.58(萬(wàn)元)
當(dāng)年應(yīng)予以費(fèi)用化的利息金額=233.58×3/12-38=58.395-38=20.395(萬(wàn)元)
當(dāng)年應(yīng)予以資本化的利息金額=233.58×9/12-(3893-893)×3%×9/12=175.185-67.5=107.685(萬(wàn)元)
年末攤余成本=3893+33.58=3926.58(萬(wàn)元)
借:財(cái)務(wù)費(fèi)用 20.395
在建工程 107.685
銀行存款 (38+67.5)105.5
貸:應(yīng)付債券-利息調(diào)整 33.58
應(yīng)付利息 (4000×5%)200
(4)2015年:實(shí)際利息費(fèi)用=3926.58×6%=235.595(萬(wàn)元)
應(yīng)付利息=4000×5%=200(萬(wàn)元)
利息調(diào)整攤銷額=235.595-200=35.595(萬(wàn)元)
當(dāng)年應(yīng)予以費(fèi)用化的利息金額=235.595×5/12-0=98.165(萬(wàn)元)
當(dāng)年應(yīng)予以資本化的利息金額=(235.595-98.165)-1000×3%/12=134.930(萬(wàn)元)
年末攤余成本=3926.58+35.595=3962.175(萬(wàn)元)
(5)2016年:利息調(diào)整攤銷額=107-33.58-35.595=37.825(萬(wàn)元)
應(yīng)付利息=4000×5%=200(萬(wàn)元)
實(shí)際利息費(fèi)用=37.825+200=237.825(萬(wàn)元)
當(dāng)年應(yīng)予以費(fèi)用化的利息金額=237.825×3/12=59.456(萬(wàn)元)
當(dāng)年應(yīng)予以資本化的利息金額=237.825-59.456=178.369(萬(wàn)元)
廠房建造期間應(yīng)予以資本化的利息金額=107.685+134.930+178.369=420.984(萬(wàn)元)
廠房達(dá)到預(yù)定可使用狀態(tài)時(shí)的入賬價(jià)值=(893+2000+2000+167)+420.984+1200150/12×30=5540.984(萬(wàn)元)
【解析】
(3)2014年:費(fèi)用化期間:3個(gè)月;資本化期間:9個(gè)月
(4)2015年:費(fèi)用化期間:5個(gè)月;資本化期間:7個(gè)月(2015年2月1日至2015年7月1日,非正常停工5個(gè)月,利息費(fèi)用應(yīng)予以費(fèi)用化)
(5)2016年:費(fèi)用化期間:3個(gè)月;資本化期間:9個(gè)月(2016年9月30日完工,10-12月利息應(yīng)予以費(fèi)用化)
【Answer】
(1)The fair value 12000000 Yuan is the book value of the land use rights acquired by Jia Company
Loss of debt restructuring recognized by Jia Company=2000-1200-500=3000000 Yuan
(2)Accounting entry for the issuance of bonds by Jia Company on 01/01/2014
Dr: Bank deposit 3893
Bonds payable-interest adjustment 107
Cr: Bonds payable-face value 4000
(3)Year 2014:
Actual interest expense=3893×6 %=2335800 Yuan
Interest payable=4000×5 %=2000000 Yuan
Amortization=233.58-200=335800 Yuan
Current expensed interest amount=233.58×3/12-38=58.395-38=203950 Yuan
Current capitalized interest amount=233.58×9/ 12-(3893-893)×3%×9/12=175.185-67.5
=1076850 Yuan
Year-end amortized cost-3893+33.58=39265800 Yuan
Dr:Financial expense 20.395
Construction-in-process 107.685
Bank deposits (38+67.5)105.5
Cr: Bonds payable-interest adjustment 33.58
Interest payable (4000×5%) 200
(4)Year2015 :
Actual interest expense=3926.58×6%=2355950 Yuan
Interest payable=4000×5 %=2000000 Yuan
Amortization of interest adjustment=235.595-200=355950 Yuan
Current expensed interest amount=235.595×5/12-0=981650 Yuan
Current capitalized interest amount=(235.595-98.165)-1000×3 %/12=1349300 Yuan
Year-end amortized cost=3926.58+35.595=39621750 Yuan
(5)Year2016 :
Amortization of interest adjustment=107-33.58-35.595=378250 Yuan
Interest payable=4000×5 %=2000000 Yuan
Actual interest expen.se-37.825+200=2378250 Yuan
Current expensed interest amount=237.825×3/12=594560 Yuan
Current capitalized interest amount=237.82-59.456=1783690 Yuan
Capitalized interest amount during the plant construction=107.685+134.930+178.369=4209840 Yuan
Book value of plant at intended condition for use
=(893+2000+2000+167)+420.984+1200/50/12×30=55409840 Yuan
相關(guān)題庫(kù)
題庫(kù)產(chǎn)品名稱 | 試題數(shù)量 | 原價(jià) | 優(yōu)惠價(jià) | 免費(fèi)體驗(yàn) | 購(gòu)買 |
---|---|---|---|---|---|
2021年注冊(cè)會(huì)計(jì)師《專業(yè)階段考試》考試題庫(kù) | 9320題 | ¥300 | ¥99 | 免費(fèi)體驗(yàn) | 立即購(gòu)買 |
2021年注冊(cè)會(huì)計(jì)師《會(huì)計(jì)》考試題庫(kù) | 1798題 | ¥50 | ¥39 | 免費(fèi)體驗(yàn) | 立即購(gòu)買 |
微信掃碼關(guān)注焚題庫(kù)
-
歷年真題
歷年考試真題試卷,真實(shí)檢驗(yàn)
-
章節(jié)練習(xí)
按章節(jié)做題,系統(tǒng)練習(xí)不遺漏
-
考前試卷
考前2套試卷,助力搶分
-
模擬試題
海量考試試卷及答案,分?jǐn)?shù)評(píng)估