ACCA考試《財(cái)務(wù)成本管理》輔導(dǎo)(2)

考試網(wǎng)  [ 2017年6月28日 ] 【

  Basic information

  To appraise an investment project, the appraiser must have information about the following relevant areas:

  1 Cost of investment project.

  2 Estimated life ofproject.

  3 Estimated net cash inflows from project.

  4 Estimated residual value of project at the end of its life if applicable.

  5 Costofcapital.

  6 Taxation implications of project.

  7 Inflation rates and effect on project.

  Anyone who has had to plan for a future activity/event should understand that the future is never certain. Bearing this in mind, one must try to predict the future by drawing from past experience and using available information either from published statistics or from other sources. Some of the data required about the project would have to be estimated taking into consideration all available information. The accuracy of these estimated data would have a consequential effect on the final result of the decision, as such care must be taken in making these estimates.

  Methods of investment appraisal

  When the decision-maker has at his/her disposal basic information about the project as stated above, he/she is then ready to use one or more of the four main methods used in appraising investment projects.

本文糾錯(cuò)】【告訴好友】【打印此文】【返回頂部
將考試網(wǎng)添加到收藏夾 | 每次上網(wǎng)自動(dòng)訪問考試網(wǎng) | 復(fù)制本頁地址,傳給QQ/MSN上的好友 | 申請鏈接 TOP
關(guān)于本站  網(wǎng)站聲明  廣告服務(wù)  聯(lián)系方式  站內(nèi)導(dǎo)航
Copyright © 2006-2019 考試網(wǎng)(Examw.com) All Rights Reserved  營業(yè)執(zhí)照
白水县| 出国| 台山市| 许昌县| 长乐市| 望江县| 德惠市| 柏乡县| 北票市| 新疆| 新晃| 云浮市| 莱阳市| 大兴区| 潍坊市| 天津市| 沂源县| 眉山市| 景宁| 冀州市| 珠海市| 都安| 华池县| 原平市| 蒙阴县| 宝丰县| 成武县| 徐闻县| 郓城县| 菏泽市| 清河县| 陆良县| 台州市| 峡江县| 若羌县| 湖南省| 财经| 会理县| 沙河市| 柘荣县| 洪江市|